Back Bolt Type Specifications

Natural stones are diverse and irregular. Each of which has its own characteristics and optimum size. WHITE GOLD will achieve the effect you want. Providing a safe, artistic facade; dry hanging solution proposal and budget friendly. WHITE GOLD suggests that you use the following sizes for preliminary design :120x60x2.5cm(48"x24"x1"),60x60x2.5cm (24"x24"x1" ) ,60x30x2.5cm (24"x12"x1" ). Using the optimum size is to shorten the construction period, save costs, and improve safety.

Specification of Aluminum Alloy

The structure is made up of profiles and brackets manufactured via the extrusion of aluminium alloy, with a minimum thickness of 2 mm. The structure will be tied to the support in order to absorb thermal expansion/shrinkage and subsidence of the support itself so that the external covering is not affected by any possible future induced stress. The safety of the system must be guaranteed via a subsequent check for every single project; in accordance with the norms relating to wind pressure/depression.

Back bolt stone curtain Advantages

Ease of installation

Compared with the traditional facade installation, dry hanging can avoid the procedure of grouting process. It can also shorten the construction period and save costs.

Ease of installation

Without using cement and glue, the colors of the slabs remain unaltered over time and the surfaces do not absorb pollution.

Water resistance

Ventilated facade prevents rain and ice from entering the wall. It can avoid the stones from falling off, and reduce maintenance costs.

Eco-friendly and resource-saving

The contact area between the stone panel and wall is empty. Therefore, it can effectively prevent the conduction of temperature, saving energy.

Safety performance

Each piece of stone has four back bolts. All of them can withstand the weight of stone and the contact area between the keel hanging pieces is large. Therefore, the whole system of stone panel is safer than standard facade.

Ease of repair

If the stone ruptured, it is not easy to fall off because the back bolt can withstand the weight of stone and easily be replaced.

Back bolt dry hanging Installation Process

After drawing the positioning of the elements according to the project on the facade, the stirrups and the fixing of the stirrups are carried out by mechanical or chemical dowels

1

The slab must be "hooked" by hitching the clips to the horizontal profile.

2

Finally, adjust the screws on the adjustment staples so that the correctly sized horizontal joints are obtained.

3

Now it is possible to fix the horizontal profiles drilled at the appropriate levels (see “slab preparation” )

4

The fixing of the stirrups to the support of the bottom will have to be realized by means of dowels appropriate dimension and adapted to the specific type of the support. The mounting of the uprights on the stirrups will be done by means of rivets, with "fixed point" and "sliding point",

5

Showcase Project

Project 1

Project 2

Project 3

project 4